Repair of Coastal Corridor in Playa Bella Initiated by Estepona City Council
ac4702ccd13c214c80ee77b44c7fd0ad

To ensure stability, the Estepona City Council has started the process of contracting the repair and stabilization of a section of the coastal corridor in Playa Bella, damaged by recent storms. The affected area includes a concrete wall connecting La Chimenea with Playa Bella. The tender for the necessary works has already been opened, aiming to address the damages caused by erosion and sea storms over the years. The initial cost for the project is set at 74,099 euros, with an estimated execution period of one and a half months. Urgent intervention is crucial to prevent further loss of sand and damage to the coastline in Estepona.

Author

foto1
Stacey Watson

Relevant Tags

Newest Articles

Estepona Local
Success for Teams from IES Profesor Tomás Hormigo, Monterroso and Puerta del Mar in the Children’s Athletics Tournament
Estepona Local
Estepona Honors the Consular Corps of Malaga with a Landmark Meeting on International Cooperation
Estepona Local
Estepona City Council reports surplus in 2025 budget liquidation
Estepona Local
The Casa de Las Tejerinas presents a tribute to Mario Algaze through contemporary Cuban art
Estepona Local
Update on Safety and Maintenance of Rural Roads in Estepona
Estepona Local
Participation of Close to Fifty Establishments in the XV Gastronomic Event ‘Enjoy Estepona’ (Estepona Gastronomic Route)